Project is mainly divided into below sections:
- Low pressure compressor station of Gachsaran I
- Low pressure compressor station of Gachsaran II
Project main units and facilities consist of:
- Gas pipeline for transferring the excess gas from Production unit to compressor station
- Compression station
- Electrical System
- Control System
- Instrument Air System
- Closed Drain System
- Fire Water Network
- Chemical Injection
Contract Time Period:
December-2007 to Sep-2010
Services:
- Conceptual Design
- Basic Engineering and FEED package preparation
- EPC tender documents