Cheshmeh Khosh

Project Info Cards

Client

ZN-Vostok Company

Owner

ZN-Vostok Company (PEDEC as the main owner)

Location

West of Dezful, Iran

نمایش دو لوگو
لوگوی شرکت اول لوگوی شرکت دوم

Preliminary Front End Engineering Design (Pre-FEED) and Front End Engineering Design (FEED) – Cheshmeh-Khosh, Dalpari and East Paydar Oil Fields

The Cheshmeh-Khosh, Dalpari, and East Paydar oil fields are located in the western part of Iran’s Ilam province, near the Iran-Iraq border. In October 2018, the National Iranian Oil Company (NIOC) signed a Development and Production Operations Service Contract (IPC) with ZN Vostok Ltd to enhance these fields.

The project involves:

  • Conducting Engineering Surveys
  • Developing Preliminary Front-End Engineering Design Documentation
  • Developing Front-End Engineering Design Documentation

Key Components of the Project

  • Wellhead Facilities
  • Well Flow Lines, Manifolds, and Gathering Systems
  • Automated Group Metering Unit (AGMU)
  • Separation Facilities
  • Desalting Unit
  • Wastewater Treatment Unit
  • Water Intake System
  • Water Injection Pumps
  • Oil Storage Facilities
  • Reconstruction of the Drainage System
  • Reconstruction of the Firefighting Station
  • Reconstruction of the Chemical Analysis Laboratory
  • 220/33 kV Power Station
  • Power and Overhead Lines

Contract Period: May 2021 to October 2024

Services

• Preliminary Front-End Engineering Design Documentation development
• Engineering Survey
• Front-End Engineering Design Documentation development.

Keywords: Cheshmeh-Khosh, Dalpari, East Paydar, Ilam, oil fields, NIOC, ZN Vostok, IPC, Pre-FEED, FEED, engineering design, gathering system, separation, desalting, wastewater treatment, power station, development contract.