Group 8

Project Description

Preliminary Front End Engineering Design (Pre-FEED) and Front End Engineering Design (FEED) works Cheshmeh-Khosh, Dalpari and East Paydar Oil Fields

Client

ZN-Vostok Company

Owner

ZN-Vostok Company (PEDEC as the main owner)

Location

West of Dezful, Iran

The Cheshmeh-Khosh, Dalpari, and East Paydar oil fields are located in the western part of Iran’s Ilam province, near the Iran-Iraq border. In October 2018, the National Iranian Oil Company (NIOC) signed a Development and Production Operations Service Contract (IPC) with ZN Vostok Ltd to enhance these fields.

The project involves:

  • Conducting Engineering Surveys
  • Developing Preliminary Front-End Engineering Design Documentation
  • Developing Front-End Engineering Design Documentation

Key components of the project include:

  • Wellhead Facilities
  • Well Flow Lines, Manifolds, and Gathering Systems
  • Automated Group Metering Unit (AGMU)
  • Separation Facilities
  • Desalting Unit
  • Wastewater Treatment Unit
  • Water Intake System
  • Water Injection Pumps
  • Oil Storage Facilities
  • Reconstruction of the Drainage System
  • Reconstruction of the Firefighting Station
  • Reconstruction of the Chemical Analysis Laboratory
  • 220/33 kV Power Station
  • Power and Overhead Lines

The contract period spans from May 2021 to October 2024.