AZAR
Client : Oil Industries Engineering and Construction (OIEC)
Owner : PEDEC
The Project overall scope is establishment of the required facilities for production of 71,500 BOPD crude from 17 production wells. Produced Oil will be exported to Cheshmeh Khosh Facilities through a 213 Km, 16 Inch Export Pipe Line. Similarly, associated gas will be compressed and exported to NGL-3100 plant through a 155 km, 16 Inch Export Pipe Line. Produced water will be treated to the standard figures and will be injected in to an injection well.
July 2012 ~ November 2012
Client : Oil Industries Engineering and Construction (OIEC)
Owner : PEDEC