Project Description

CO plant

Client

Sazeh

Owner

Fanavaran Petrochemical Company

Location

Bandar Imam , Iran

The plan will include the following process units and all necessary ancillary units:

  1. Feed Gas Preparation and Desulfurization Process Unit, comprising:

    • Feed gas preheating section
    • Feed gas desulfurization section
    • Reforming section
    • Waste heat recovery/steam production section
  2. CO2 Removal Process Unit, consisting of:

    • CO2 absorption section
    • Regeneration of solvent solution section
    • Final cooling section
  3. Purification Process Unit, including:

    • CO purification (by cryogenics-compression) section
    • Drying section
  4. Interconnection, Tankage, and Other Auxiliary Facilities Units for the entire plant.

In total, the plant is expected to produce 14,000 metric tons per year (MTPY) of final CO products, based on an annual operating duration of 7,920 hours.