The project aims to establish the necessary facilities to produce 71,500 barrels of oil per day (BOPD) from 17 production wells. The produced oil will be exported to the Cheshmeh Khosh Facilities through a 213 km, 16-inch export pipeline. Similarly, associated gas will be compressed and exported to the NGL-3100 plant via a 155 km, 16-inch export pipeline. Produced water will be treated to meet standard specifications and injected into an injection well.