LabSefid

LAB SEFID

Lab Sefid Gas Gathering and Injection Project has been planned by National Iranian South Oil Company (INSOC) to prevent associated gas flaring from Lab Sefid Oil Production plant, which is located 50 km, north east of Dezful, Iran.
By commissioning this project, the existing Lab Sefid Oil Production plant will be extended and the following units/pipeline will be added:

  • Sweetening Unit
  • Sweetening of 17000 Standard Barrel per day of sour Lab Sefid / Palangan’s crude oil
  • Gas Compression & Injection Unit

Released gas from Lab Sefid Oil Production plant will be compressed in different stages after gathering and finally injected to the Lab Sefid well no.7. The maximum required injection rate is 27000 MMSCFD.
According to the fact that the amount of Lab Sefid oil field’s associated gas is less than that required for injection to Lab Sefid well no.7, Bangestan gas from well no.5 will be used as a supplementary source.

Pipeline facilities

  • Gas Transferring Pipeline: For transferring Bangestan gas from well no.5 to production unit which is approximately 5.5 Km away.
  • Injection Pipeline: For transferring compressed gas from Compression Unit to Labsefid well no.7 which is approximately 6 Km away.

Other Facilities:

  • Instrument/Plant Air
  • Fuel Oil/Gas System
  • Closed Drain System
  • Flaring System
  • Fire/Potable/Service Water Network
  • Waste Water Treatment
  • Chemical Injection

Contract Time Period:

Sep-07 to Sep-08

Services:

  • Conceptual Study and Basic Engineering
  • Preparation of FEED Package
Dezful Map Location
Project Card - TRC

Client : National Iranian South Oil Company (NISOC)

Owner : National Iranian South Oil Company (NISOC)