The Project consists of designing two major Heavy Fuel Oil Storage Facilities including Two Tank Farms with the capacity of 230,000 cubic meter and 140,000 cubic meters Pumping Station, 110 km of Distribution Pipe Line and all other Auxiliary Facilities and Units Such as Steam Generation Unit, Plant Air System, Fire fighting, Administration building and etc.