ICOFC has planned to accomplish Design, Procurement, Construction and Commissioning of the Wellheads, Gathering system and Gas refinery plants of Halegan & Sefid Baghoon gas fields. The project overall scope is establishment of the required facilities for production of 20,000 MMSCMD gas from 12 production wells. Produced gas will be exported to IGAT-4 pipeline. The established goal of this national project is to design, procure and construct this gas plant with the knowledge and experience of Iranian companies. Tehran Raymand has been selected as the consultant for pre-conceptual and feasibility study of this project.
The facilities of National Gas Refinery include:
- Well Head Facilities
- 12 flow lines
- 3 Manifolds
- Reception Facilities
- Gas Treatment – RIPI License
- Dehydration and Dew Point control
- MEG Injection and regeneration
- Propane Refrigeration
- Condensate stabilization and off gas compression
- Sour Water stripper
- Sulfur Recovery Unit – RIPI License
- Condensate Storage and Transfer
- Utilities
- Gas Export Pipeline
- Condensate export pipeline