Foroozan TehranRaymand Oil and Gas company Tehran Iran

FOROOZAN Offshore Complex Development

The scope of work consists of following topics:

    • New Offshore Platforms & Connecting Bridge

To extract crude oil, one unmanned wellhead platform (F19) is planned to be installed about 7.8 km far from existing FX platform equipped with the minimum production facilities, including topside and a jacket.

    • Modifications on Existing Platforms

To increase the Filed Productivity, Gas Lift Operation is intended. Therefore, some modification including extending Gas Producer Manifold on F16, installation of 5 Transferring Pumps at FX, KOD on FY, Gas Lift Piping Between F15, F18 & F19, Methanol Injection Package on FY (F16), Corrosion Inhibitor on FY (F16), F15, F2 & F8, Generating Electrical Power at FX-A, transferring of LQ and Control Room from FX to FX-A, Oily Water Treatment Package on FX, …, and the required utilities and facilities have been foreseen to be designed, procured and installed

    • SUBSEA PIPELINES

To transport fluids between new F19 and Existing FX Platform, three 12″, 8″, 6″ subsea pipelines must be installed.

    • SUBSEA CABLES

To supply power for FX area platforms and to make communication between FX/FX-A and satellite platforms, subsea cables with 120% of required power capacity including fiber optic for communication must be installed.

Contract Time Period:

Jan 2021 ~ Jul 2023

Services:

  • Basic Design
  • Detailed Design
  • Procurement Engineering Services
Gas icon

FOROOZAN Offshore Complex Development

Client : Consortium of Petropars Limited Company (PPL) and Mobin Sazeh Gostar (ISOICO/MSG)
Owner : Iranian Offshore Oil Company (IOOC)