In pursuance of the NIGC’ goal of making an effective contribution to the development of the Iranian oil & gas industry and alleviation of any operational difficulties, their Research/Development/Technology Department has recently started to establish gas processing technologies (i.e. gas sweetening process). Considering this and in accordance with the excellent reputation of the Research Institute of Petroleum Industry (RIPI) in providing the engineering solutions to the oil and gas industries through a combination of research and development in process simulation with state of the art computerized engineering technology, NIGC and RIPI has signed a contract for preparing FEED package and EPC tender document of gas sweetening pilot plant, which will be designed and installed in South Pars Gas Field, located in Southwest of Iran.
In light of the above and in order to provide executive companies with flexible, accurate, and efficient technologies, which improve their bottom line,
NIGC has invited
Tehran Raymand Consulting Engineers to review the relevant process technology effort and engineering concepts for ensuring proper execution of the above-mentioned project and acquisition of aimed knowledge and skills.
Contract Time Period:
8 months
Services:
- Reviewing FEED Package and EPC Tender Documents
- Reviewing Conceptual Design Documents