Tehran Raymand project: Gas Inlet Line from Sea line to Onshore Facilities
Gas project

Gas Inlet Line from Sea line to Onshore Facilities

Petro Tadbir e Pars Company as Contractor of Persian Oil & Gas Company (Owner) intends to connect phase 18 sea line gas field to phase 15 for production at full capacity by approximately 2 Km 32” pipeline.

View all projects

Project brief

Client
Petro Tadbire Pars Company
Location
Assaluyeh, Iran
Contract period
August 2014 ~ November 2014
Services
  • Conceptual Study
  • Detail Engineering
  • Field Engineering Activities

Project overview

Petro Tadbir e Pars Company as Contractor of Persian Oil & Gas Company (Owner) intends to connect phase 18 sea line gas field to phase 15 for production at full capacity by approximately 2 Km 32” pipeline. The purpose of this project is using full production capacity of phase 15&16 onshore facilities until the fully commissioning of phase 15&16 offshore facilities. This project has been awarded to Tehran Raymand for conceptual, detail design, and field engineering activities.

Project location

Assaluyeh, Iran

Open location in OpenStreetMap