Aban West Paydar project image
Gas project

Aban West Paydar

Aban and West Paydar oilfields are located in the western part of Iran, on the Iran-Iraq border. Development and production operations service contract (IPC) for Aban and West Paydar oilfields between National Iranian Oil Company ( NIOC ), ZN Vostok Ltd and Dana Energy was…

View all projects

Project brief

Client
ZN-Vostok Company
Location
West of Dezful, Iran
Contract period
Mar 2019 ~ Feb 2022
Services
  • FEED Design
  • Detailed Design of Earthworks & Foundations
  • Detailed Design Supervision

Project overview

Aban and West Paydar oilfields are located in the western part of Iran, on the Iran-Iraq border. Development and production operations service contract (IPC) for Aban and West Paydar oilfields between National Iranian Oil Company ( NIOC (opens in a new tab) ), ZN Vostok Ltd and Dana Energy was signed on March 14, 2018. The project objective is to prepare FEED Package, Detailed Design of earthworks and foundations and Supervision of Detailed Design.

The main units of this project are listed here: Wellhead Facilities Automated Group Metering Unit (AGMU) Free Water Knockout Unit (FWKOU) Crude Transportation Cheshmeh-Khosh Central Processing Facility (CPF) consisting of: Bank D Separators Test Line Separator Crude Custody Transfer Metering Unit Chemical and Analytical Laboratory Shift Camp

Project location

West of Dezful, Iran

Open location in OpenStreetMap