Project Description
Darquain Oil Field Development 1st Stage
During this stage, the plan includes drilling three appraisal wells, five development wells, and one gas injection well. The anticipated oil production rate is 50,000 barrels of oil per day (BOPD).
Surface Facilities:
- A gathering system
- A production facility with a sustainable oil treatment capacity of 55,000 BOPD (design condition) and a peak rate of 60,000 BOPD
- A 17-kilometer, 12-inch export oil pipeline to a tie-in point beyond the Karun River
- A gas injection system to recover gas from the 1st and 2nd stage oil separators, with a gas compression capacity of 70 million standard cubic feet per day (MMSCFD)