In accordance with the policy of early production from Changuleh field, located at the Zagros foreland basin along the Iran/Iraq border, Petroleum Engineering and Development Company (PEDEC) has planned to establish a new production unit with the normal operating/design capacity of 15,000/16,500 BOPD from Changuleh oil field. The crude oil at early production stage will be send to Dehloran facility via export pipeline. The project overall scope is establishment of the minimum facilities as well as developing existing facilities (separators) for early production of heavy crude in order to achieve 15,000 BOPD of crude from two existing and four new wells. Produced oil will then be transferred to Dehloran Oil Facilities by means of a Pump Station and through a 95 Km export pipe line.
The facilities of Changuleh Field include:
- Well Head Facilities
- 8” flow lines
- 3 Phase Separator
- Storage Tank
- Crude Oil Pump Station
- Export Pipe line
- Pig Traps
- Flare and Burn Pit Package
- Utilities
Contract Time Period:
June 2012 ~ September 2012
Services:
- FEED Updating
- Procurement Engineering Services for Long Lead Items
- Development of Detailed design up to Vendor Data Incorporation
- Preparation of Tender Packages