Benzene & Gasoline Production Plant from Pyrolysis Gasoline

Project Info Cards

Client

TIV Engineering & Construction Company (TIV)

Owner

Sadra Petrochemical Company (SPC)

Location

Mahshahr, Iran

نمایش دو لوگو
tehranraymandم

Benzene & Gasoline Production Plant from Pyrolysis Gasoline

All the Work and Services in connection therewith for the establishment of Benzene & Gasoline Production Plant from Pyrolysis Gasoline including all the EPCC activities such as Conceptual Studies, Basic Engineering Design, Detail Engineering Design, Procurement, Construction, Commissioning as specified in contract.

Client

TIV Engineering & Construction Company (TIV)

Owner

Sadra Petrochemical Company (SPC)

Location

Mahshahr, Iran

Project Overview

SADRA PETROCHEMICAL COMPANY (SPC) will establish the plant for production of Benzene and Gasoline from pyrolysis Gasoline in Mahshahr, Iran. Feed flowrate is 120000 tons/year and the goal of project is to achieve Benzene and Gasoline by high purity. Required utilities are supplied from Fajr Petrochemical Company. In addition to process unit, some offsite utilities such as tank farm, flare facilities, truck loading and building (IB/NIB) are in the scope of work.

Contract Time Period

August 2023 ~ August 2025

Services

  • Conceptual Studies
  • Licensor PDP Endorsement
  • Basic Engineering Design
  • Detail Engineering Design & Procurement Engineering Services
  • Site Field Engineering Services