PEDEC
National Iranian Oil Company (NIOC)
Ilam, Iran
The Petroleum Engineering and Development Company (PEDEC) has planned the Azar & Changuleh Oil Fields Development Project to produce crude oil from these two fields, located near the international border with Iraq.
Project Overview:
Scope: Establish minimal facilities and develop existing separators for early production of heavy crude.
Initial Production Target: Achieve 15,000 barrels of oil per day (BOPD) from two existing and two new wells.
Final Production Target: Achieve a daily production rate of 75,000 BOPD.
Oil Transport: Transport produced oil to Dehloran Oil Facilities via a pump station and a 127 km, 20-inch export pipeline.
Facilities at Changuleh Field:
Project Overview:
Scope: Establish necessary facilities to produce 75,000 BOPD of crude oil from 15 wells.
Oil Transport: Export produced oil to the Sabzab station through a 270 km, 16-inch export pipeline.
Gas Export: Compress and export associated gas to the NGL-3100 plant via a 130 km, 16-inch export pipeline. A portion of the associated gas will be used in gas turbine drives.
Facilities at Azar Field: