The Project overall scope is establishment of the required facilities for production of 71,500 BOPD crude from 17 production wells. Produced Oil will be exported to Cheshmeh Khosh Facilities through a 213 Km, 16 Inch Export Pipe Line. Similarly, associated gas will be compressed and exported to NGL-3100 plant through a 155 km, 16 Inch Export Pipe Line. Produced water will be treated to the standard figures and will be injected in to an injection well.
The facilities of Azar Oil Field include:
- Well Head Facilities
- 8” flow lines
- 3 Phase Separators (2 stages)
- Desalting Unit
- Stabilization unit
- Crude Oil Storage Tanks
- Crude Oil Pump Station
- Oil Export Pipe line
- Pig Traps
- Gas Dehydration Unit
- Gas Compressor Station
- Gas Export Pipe Line
- Waste Water Storage Tank
- Waste Water Treatment Unit
- Waste Water Injection Pumps
- Waste Water Injection Pipeline
- Flare and Burn Pit Package
- Utilities
Contract Time Period:
July 2012 ~ November 2012
Services:
- FEED Updating
- Procurement Engineering Services for Long Lead Items
- Development of Detailed design up to Intermediate Stage
- Preparation of Tender Packages