The Azadegan onshore oil field, located in South West Iran was discovered in 1999 by NIOC. This oil field near the zero-point border with Iraq, located approximately 80 kilometers west of Ahvaz city in Khuzestan Province. This field, with an estimated area of 1,500 square kilometers.
The services include:
- Conceptual Study
- Develop Basic Engineering Design
- Front-End Engineering Design (FEED)
- Preparation of Tender Package for EPC
- Preparation of Inquiry for Long Lead Items (LLI)
The main units of this project are listed here:
- Wellhead Facilities
- Well flow lines, Truck line, Transfer Line, manifolds and gathering system
- Gas Export Pipe Line
- Oil Export Pipe Line
- Gas Oil Separation Unit (GOSP)
- Central Oil Treatment and export Facilities (CTEP)
- Central Production Facility (CPF)
- Oil Gathering Manifold (OGM)
- Separation Facilities
- Desalting Unit
- Gas Dehydration Unit
- Gas Compressor Station
- Water Treatment Unit
- Water Intake
- Water injection pumps
- Oil storage facilities
- Reconstruction of drainage system
- Reconstruction of firefighting station
- Power Generation
- Utilities
Contract Time Period:
February 2025 ~ February 2026
Services:
- Project Management
- Conceptual Study and Develop Basic Engineering
- Preparation of FEED Package, inquiry for LLI items and EPC Tender Package