ABAN WEST PAYDAR

Aban and West Paydar oilfields are located in the western part of Iran, on the Iran-Iraq border. Development and production operations service contract (IPC) for Aban and West Paydar oilfields between National Iranian Oil Company (NIOC), ZN Vostok Ltd and Dana Energy was signed on March 14, 2018. The project objective is to prepare FEED Package, Detailed Design of earthworks and foundations and Supervision of Detailed Design.

The main units of this project are listed here:

  • Wellhead Facilities
  • Automated Group Metering Unit (AGMU)
  • Free Water Knockout Unit (FWKOU)
  • Crude Transportation
  • Cheshmeh-Khosh Central Processing Facility (CPF) consisting of:
    • Bank D Separators
    • Test Line Separator
    • Crude Custody Transfer Metering Unit
    • Chemical and Analytical Laboratory
    • Shift Camp

Contract Time Period:

Mar 2019 ~ Feb 2022

Services:

  • FEED Design
  • Detailed Design of Earthworks & Foundations
  • Detailed Design Supervision
West of Dezful Map Location
West of Dezful, Iran

Client

ZN-Vostok Company

Owner

ZN-Vostok Company (Final Owner: Petroleum Engineering Development Company)