In the second stage of development, fifteen production wells will be added to the previous eight. To maintain reservoir pressure, four gas injection wells and one water injection well will be utilized.
Expected Production Capacity:
Second Stage: 130,000 barrels of oil per day (BOPD)
First Stage: 50,000 BOPD
Total Capacity: 180,000 BOPD
Major Surface Facilities
I. Gathering and Injection System (Off-Plot Area):
Wellhead Area
Cluster Area: Manifolding wellhead production
Production Lines: 6”, 10”, 12”
Injection Lines: 10”, 12”
II. Oil Treatment and Gas Compression (On-Plot Area):
Oil Production (Treatment) Trains:
Two trains (one existing from the first stage)
Gas Compression Trains:
Three trains (2-stage compressor) (one added in the first stage)