ZN-Vostok Company
ZN-Vostok Company (Final Owner: Petroleum Engineering Development Company)
West of Dezful, Iran
Location: Western Iran, near the Iran-Iraq border
Contract Date: March 14, 2018
Contractors: National Iranian Oil Company (NIOC), ZN Vostok Ltd, Dana Energy
The Aban and West Paydar oilfields, located near the Iran-Iraq border in western Iran, are vital assets in the region’s hydrocarbon reserves. These fields are being developed under an Integrated Petroleum Contract (IPC), signed on March 14, 2018, between the National Iranian Oil Company (NIOC), ZN Vostok Ltd, and Dana Energy. The primary goal is to boost oil production capacity while adopting international best practices in engineering, FEED preparation, and execution.
A key focus is delivering a reliable FEED (Front-End Engineering Design) package. This technical blueprint guides decisions in procurement, scheduling, and construction. Accurate FEED preparation at this stage ensures project feasibility and minimizes rework and delays during execution.
Each objective is interconnected, contributing to the reliability and safety of the overall facilities. Effective FEED preparation supports smooth transitions to procurement and construction, helping to control costs and reduce schedule risks.
The project involves the design and execution of essential units for crude oil production and handling:
The Aban and West Paydar project plays a critical role in Iran’s national energy strategy. The FEED package forms the foundation of the entire operation. Every technical choice in this phase impacts cost, schedule, and final performance.
Emphasizing robust wellhead systems, automated metering, and efficient processing aligns the project with international oil and gas standards. The inclusion of real-time monitoring and analytics boosts both safety and efficiency. This project will significantly contribute to Iran’s oil production and support its energy exports and regional development.