TehranRaymand Oil and Gas company Tehran Iran

DARQUAIN 2nd Stage

During second stage of development, fifteen production wells will be added to previous eight. Four gas injections together with one water injection will maintain reservoir pressure. Expected oil production capacity for second stage (only) is 130,000 BOPD. Considering first stage production rate (50,000 BOPD), the plant capacity will hit 180,000 BOPD. Major surface facilities are comprised of:

I – Gathering and Injection System (Off-Plot Area)

  • Wellhead area
  • Cluster area (Manifolding wellhead production)
  • Production Lines (6” , 10” , 12”)
  • Injection Lines (10” , 12”)

II – Oil Treatment and Gas Compression (On-Plot Area)

  • Two oil production (treatment) trains.
  • Note: One oil train exists from first stage
  • Three gas compression trains (2 stage compressor)
  • Note: One train is added for first stage
  • Utility area
  • One 33/6 KV substation, One 6/0.4 KV substation

Contract Time Period:

May 2005 – May 2010

Cooperation With Other Companies:

  • Sazeh Consultants Co.
  • Snamprogetti Ltd.

Services:

  • Detail engineering
  • Procurement engineering services
Map Location
Project Card - TRC

Client : Sazeh Consultants

Owner : Petroleum Engineeirng & Development Company (PEDEC)