The capacity of each sulfur recovery unit is 650 MTPD and the system is designed and operates based on CLAUS processing system.
The 4th unit shall be built neighboring the 3rd unit in the battery limit of Khangiran Refinery.

The reasons and objectives to build a new SRU unit are:

  • Environmental issues
  • Increasing sulfur production
  • Increasing catalysts’ life time

Contract Time Period:

January 2003 to January 2005

Cooperation with other companies:

Services:

  • Engineering and design services
  • Preparation of tender documents for construction and erection
  • Technical bid evaluation
  • Vendor data review
Gas icon

KHANGIRAN

Client : Sazeh Consultants
Owner : National Iranian Gas Company