NGL-2300 and CFU-200

A) NGL-2300 (Ahwaz)
The purpose of NGL-2300 plant is to maximize the C2+ recovery. The feed gas for this plant is provided from:

  • Separated gas from 1st stage of Maroon-Khami plant (156 MMSCFD)
  • Gas condensate stabilization units of Maroon-Khami plant (18 MMSCFD)
  • Produced gas from Maroon-5 production unit (82 MMSCFD)

Recovered C2+ condensates in this plant are transferred to CFU-200 separation unit in Mahshahr and produced sweet gas is injected to Maroon oil field.
This plant consists of following units:

  • LP gas compression unit
  • Gas sweetening unit
  • Gas dehydration unit
  • Acid gas compression unit
  • C2+ recovery unit
  • C2+ purification unit
  • Utilities
  • Pipelines (C2+ condensates, Sweet Gas and Acid Gas)

B) CFU-200 C2+ Separation plant (Bandar Maah-Shahr)
C2+ from NGL 2300 (Above), NGL 1700, 1900 & 2000 is gathered in CFU-200 plant. In this plant Ethane, Propane, Butane and C5+ will be recovered and stored/transferred. This plant includes below units:

  • De-Ethanizer
  • De-Propanizer
  • De-Butanizer
  • Storage Tanks (for Propane, Butane and C5+)
  • Transfer Pumps
  • Utilities

Contract Time Period:

Oct-2006 ~ Sep-2010

Cooperation With Other Companies:

  • Sazeh Consultants (JV Partner)

Services:

  • Feasibility Study
  • Basic Engineering
  • Value Engineering
  • FEED Package Preparation
  • Preparation of Tender Package for EPCC Project
Bandar Mahshahr Map Location
Project Card - TRC

Client : National Iranian South Oil Company (NISOC)

Owner : National Iranian South Oil Company (NISOC)