Azar & Changuleh Oil Fields Development Project has been planned by the Petroleum Engineering and Development Company (PEDEC) to produce crude oil from these two fields, which are located near the international border with IRAQ.
The project overall scope is establishment of the minimum facilities as well as developing existing facilities (separators) for early production of heavy crude in order to achieve 15,000 BOPD of crude from two existing and two new wells, where the final Production will be 75,000 BOPD.
Produced oil will then be transmitted to Dehloran Oil Facilities by means of a Pump Station and through a 127 Km, 20 Inch export pipe line.
The facilities of Changuleh Field include:
The project overall scope is establishment of the required facilities for production of 75,000 BOPD crude from 15 wells.
Produced Oil will be exported to Sabzab station through a 270 Km, 16 Inch Export Pipe Line. Similarly, associated gas will be compressed and exported to NGL-3100 plant through a 130 km, 16 Inch Export Pipe Line. Small portion of the associated gas will be used in gas turbine drives.
The facilities of Azar oil Field include:
March 2009 ~ March 2010