The PSA has been contracted by the National Iranian Oil Company (NIOC) to conduct the EPCC for South Pars Phases 13-22/23&24 project. This project includes offshore facilities, platform and undersea pipelines, and Onshore Facilities for the processing of the reservoir fluid.
Sazeh-Nargan Consultants has been contracted by the PSA, whom conducted the Basic Engineering and FEED for the onshore facilities.
The South Pars Phases 13-22/23&24 Project Offshore Scope of Work is being carried out by another Offshore Consultant.
Tehran Raymand Consulting Engineers has been contracted by Sazeh Consultant to perform the FEED and Detail Design of many Onshore facilities units of South Pars Phases 13-22/23&24.
The total capacity of the South Pars phases 22/23&24 onshore facilities is 2000 MMSCFD of reservoir Fluid, which include all processing units, utilities, off sites and infrastructure necessary to produce sales gas and stabilized condensate form the reservoir Fluid delivered to the onshore plant via two multiphase sea lines.
The objective of project is to perform FEED, general engineering activities, detail engineering design and engineering procurement services for above mentioned units / areas.
June 2010 ~ June 2012