Project Description
Preliminary Front End Engineering Design (Pre-FEED) and Front End Engineering Design (FEED) works Cheshmeh-Khosh, Dalpari and East Paydar Oil Fields
Client
ZN-Vostok Company
Owner
ZN-Vostok Company (PEDEC as the main owner)
Location
West of Dezful, Iran


Cheshmeh-Khosh, Dalpari, and East Paydar Oil Fields are situated in the western part of Iran’s Ilam province, near the Iran-Iraq border. The Development and Production Operations Service Contract (IPC) for these fields was signed between the National Iranian Oil Company (NIOC) and ZN Vostok Ltd in October 2018. The project aims to carry out Engineering Survey, develop Preliminary Front-End Engineering Design Documentation, and develop Front-End Engineering Design Documentation.
The primary components of this project include:
– Wellhead Facilities
– Well flow lines, manifolds, and gathering system
– Automated Group Metering Unit (AGMU)
– Separation Facilities
– Desalting unit
– Waste water treatment unit
– Water Intake
– Water injection pumps
– Oil storage facilities
– Reconstruction of drainage system
– Reconstruction of firefighting station
– Reconstruction of chemical analysis laboratory
– Power station 220/33 kV
– Power and Overhead lines
Contract Time Period: May 2021 to October 2024.