Project Description
NGL 3200 – West Karoun Area, Integration and Interconnecting
Client
SADAF Company
Owner
Petroleum Engineering & Development Company (PEDEC)
Location
Khuzestan, Iran
The Petroleum Engineering Development Company, a subsidiary of the Iranian Ministry of Petroleum, has awarded the West Karoun Area NGL 3200 project to SADAF company under an EPCF (Engineering, Procurement, Construction, and Financing) contract.
Purpose:
- The plant will receive 500 MMSCFD of sour gas from the West Karoun oil field, which includes Darquain, Yadavaran, Jofeir, Bande Karkhe, South Azadegan, and North Azadegan.
- The project involves processing and producing:
- C2+ NGL cuts
- Lean Gas
- Sulfur
Engineering and Design
Tehran Raymand Consulting Engineers has been contracted by SADAF to maintain project integrity and perform the detailed design of the common system and interconnecting areas of the project.
Scope of Work:
- Project Management
- Integration Management
- Interface Coordination
- Detailed Engineering
- Procurement Engineering Services for interconnecting areas and common facilities among the following units:
Key Units and Facilities
- HV Substation (Unit 05)
- Power Transmission Line (Unit 10)
- Pipeline 36” (Unit 15)
- Pipeline 16” (Unit 20)
- Water Intake and Water Pipeline (Unit 25)
- Reception Facility Unit (Unit 100)
- Gas Sweetening Unit (Unit 200)
- Condensate Stabilization Unit (Unit 300)
- NGL Recovery Unit (Unit 400)
- Polishing Unit (Unit 500)
- Sulfur Recovery Unit (Unit 600)
- Gas Compressor Unit (Unit 700)
- Water Treatment (Unit 800)
- Fire Fighting Water System (Unit 900)
- Power Generation (Unit 910)
- General Utility (Unit 915)
- Flare System and Liquid Disposal (Unit 920)
- Fuel Gas System (Unit 930)
- Fuel Oil System (Unit 940)
- Chemical Injection System (Unit 950)
- Steam Generation (Unit 960)
- Buildings (Unit 970)
- Sour Water Stripping (Unit Hold)
- Waste Water Treatment (Unit 980)
- Air Compression (Unit 990)
- Instrument and Plant Air System (Unit 990)
- Nitrogen System (Unit 990)
- Telecommunication System (Unit Hold)
- Interconnecting (Unit 1000)
Contract Time Period
- Duration: September 2019 to October 2019